Assessment example 01
Two problem areas, one connected drainage plan
See how foundation-area moisture, concentrated roof runoff, uneven grading and a confined side yard were evaluated together. The example includes the existing conditions, proposed catch-basin locations, downspout connections, solid-pipe route and grading logic.
- Ten site, reference and plan visuals
- Area-by-area findings and proposed scope
- No customer identity, address or pricing
